Airport
Country
| Description of Activities
| Portfolio of Products
| Portfolio of Services
| Year
|
Airport Frankfurt
Germany
| Apron Lighting System High Voltage Distribution Communication Network
| light fixtures cabling
| delivery documentation installation service
| since 1965
|
Airport Munich
Germany
| High Voltage- and Communication Network Apron Lighting System
| light fixtures cabling
| engineering delivery installation service
| 1984
|
Airport Rhein-Neckar
Germany
| Runway- and Taxiway Lighting Apron Lighting Threshold Flash Lights
| light fixtures cabling
| engineering delivery installation setting in operation documentation
| 1974/1986 permanent activities
|
Airport Lemwerder
Germany
|
| light fixtures
| installation
| 1976/1977
|
Airport Köln/Bonn
Germany
| Runway Centerline Lighting
| light fixtures
| installation
| 1977/1981
|
Airport Bayreuth
Germany
| Runway- and Taxiway-Lighting
| light fixtures cabling
| delivery installation
| 1978
|
Dornier Airport Oberpfaffenhofen
Germany
| Approach-, Runway- and Taxiway-Lighting Remote Control Desk Constant Current Regulator and Communication Network
| light fixtures cabling CCRs control & monitoring system power supply
| engineering delivery installation setting in operation documentation
| 1978/1985
|
Airport Hannover-Langenhagen
Germany
| Communication Network
| cabling
| engineering installation
| 1982/1983
|
Airport Frankfurt
Germany
| Communication Network
| cabling
| delivery installation
| 1983
|
Airport Munich
Germany
| High Voltage Distribution
| cabling
| delivery installation
| 1984
|
Airport Munich-Riem
Germany
| Taxiway Centerline Lighting
| light fixtures cabling
| engineering installation setting in operation
| 1986
|
Airport Rhein-Neckar
Germany
| Approach Flash Lighting Constant Current Regulator Runway Lighting
| light fixtures cabling CCRs
| engineering delivery installation setting in operation
| 1987
|
Airport Paderborn
Germany
| New Construction Taxiway Lighting Apron Lighting Renewal: Constant Current Regulator Taxiway Lighting PAPI extension Threshold Lighting
| light fixtures cabling
| engineering delivery installation setting in operation
| 1988
|
Airport Westerland
Germany
| Approach Lighting Constant Current Regulator
| light fixtures cabling CCRs
| engineering delivery installation setting in operation
| 1989
|
Airport Munich
Germany
| Erection of the complete Lighting System
| light fixtures cabling
| engineering installation setting in operation
| 1989/1990
|
Dornier Airport Oberpfaffenhofen
Germany
| Taxiway Lighting
| light fixtures cabling
| engineering delivery installation setting in operation
| 1989
|
Airport Munich
Germany
| Taxiway Guidance Signs
| signs
| engineering installation setting in operation
| 1990/1991
|
Airport Hannover
Germany
| Runway Lighting
| light fixtures cabling
| engineering installation setting in operation
| 1990
|
Heliport Petersberg Laupheim
Germany
| Approach Flash Lighting
| light fixtures cabling
| engineering delivery setting in operation
| 1990
|
Airport Dresden
Germany
| Taxiway Lighting
| light fixtures
| engineering delivery installation setting in operation
| 1991
|
Luftwerft Hamburg
Germany
| Apron Lighting Taxiway Lighting Electrotechnical Equipment
| light fixtures cabling power supply
| engineering delivery installation setting in operation documentation
| 1991
|
Airport Abuja
Nigeria
| Approach Flash Lights
| light fixtures
| engineering delivery
| 1992
|
Heliport Nennig-Wunstorf
Germany
| Approach Flash Lighting for Heliport
| light fixtures cabling
| engineering delivery installation setting in operation
| 1992
|
VLP Magdeburg
Germany
| Mobile Airfield Lighting System Runway Lighting
| light fixtures cabling
| light fixtures cabling setting in operation
| 1992/1993
|
Heliport Hospital Rottenmünster
Germany
| Approach Flash Lighting for Heliport
| light fixtures cabling
| engineering delivery installation
| 1992
|
Airport Rhein-Neckar
Germany
| Taxiway Lighting PAPI
| light fixtures cabling CCRs
| engineering delivery installation setting in operation
| 1992
|
VLP Gera
Germany
| Mobile Airfield Lighting System Runway Lighting
| light fixtures cabling CCRs
| engineering delivery setting in operation
| 1992
|
Airport Bückeburg
Germany
| Delivery and Installation of Airport Cables, Installation of Approach Lighting and crossbars
| light fixtures cabling
| delivery installation setting in operation
| 1992
|
Hannover Airport
Germany
| Regulator System COSAL Remote Control and Monitoring System
| control & monitoring system CCRs
| engineering delivery installation setting in operation documentation service
| 1992/1993
|
Heliport Ruchheim
Germany
| Mobile Airfield Lighting System
| light fixtures cabling
| engineering delivery installation setting in operation documentation
| 1992/1993
|
Airport Warsaw
Poland
| Airfield Lighting System and Monitoring System
| cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation service
| 1994
|
Airport Schwäbisch Hall
Germany
| Runway Lighting Approach Lighting
| light fixtures cabling
| engineering delivery installation setting in operation documentation service
| 1993/1994
|
Airport Schwäbisch Hall
Germany
| Control System COSAL
| CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 1994
|
Airport Paderborn
Germany
| Approach Flash Lighting Constant Current Regulator Taxiway Lighting Expansion Control Panel
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 1994/1995
|
Airport Hannover
Germany
| Regulator System COSAL selective light failure detection
| cabling CCRs
| engineering delivery installation setting in operation documentation
| 1995/1996
|
Airport IASI
Romania
| Complete Airfield Lighting System
| light fixtures signs cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 1996/1997
|
Airport Aktau
Kazakhstan
| Constant Current Regulator System COSAL and Control System
| cabling ccrs control & monitoring system
| engineering delivery installation setting in operation documentation
| 1995
|
Airport Paderborn
Germany
| AFL System
| light fixtures cabling
| engineering delivery installation setting in operation documentation
| 1996
|
Airport Poznan
Poland
| Constant Current Regulator System COSAL and Control System
| cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 1996
|
Airport Halle-Oppin
Germany
| Runway Lighting
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 1996
|
Airport Hannover
Germany
| Guidance Signs 2nd Extension
| cabling signs
| engineering delivery installation setting in operation documentation
| 1997
|
MEB Heliport
Germany
| Complete Airfield Lighting System
| cabling light fixtures CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 1996/1997
|
Airport Haßfurt
Germany
| Complete Lighting System - renovation -
| light fixtures signs cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 1996/1997
|
Heliport Wriezen
Germany
| Complete Airfield Lighting System
| cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation service
| 1997
|
International Airport Akmola
Kazakhstan
| Complete Turn-key Airfield Lighting System
| light fixtures signs cabling CCRs control & monitoring system power supply
| engineering delivery installation setting in operation documentation
| 1997
|
Airport Hannover
Germany
| Airfield lighting system Guidance Signs 3rd Extension
| signs
| engineering delivery installation setting in operation documentation
| 1997
|
New Athens International Airport Spata
Greece
| Complete AFL System for new CAT II International Airport
| light fixtures signs cabling CCRs control & monitoring system individual lamp control power supply
| engineering delivery installation setting in operation documentation
| 1997/2000
|
New Athens International Airport Spata
Greece
| Street, Fence and Apron Lighting for new International Airport
| cabling control & monitoring system power supply
| engineering delivery installation setting in operation documentation
| 1997/2000
|
International Airport Almaty
Kazakhstan
| Turn-key Airfield Lighting System PAPI Monitoring system Medium / Low Voltage Switchgear
| light fixtures signs cabling CCRs control & monitoring system individual lamp control power supply
| engineering delivery installation setting in operation documentation
| 1998
|
Airport Manching
Germany
| Constant current regulators Monitoring system
| cabling CCRs control & monitoring system power supply
| engineering delivery installation setting in operation documentation
| 1998
|
Airport Rhein-Neckar
Germany
| Constant current regulators Monitoring system
| cabling ccrs control & monitoring system power supply
| engineering delivery installation setting in operation documentation
| 1998
|
Airport Jonköping-Axamo
Sweden
| Constant current regulators Monitoring system SMGCS
| CCRs control & monitoring system individual lamp control
| engineering delivery installation setting in operation documentation
| 1998/1999
|
United Clinics
Germany
| Airfield Lights Obstruction light Elevated light
| light fixtures
| delivery
| 1998
|
Airport Warsaw
Poland
| Navigation Lighting PAPI
| light fixtures cabling CCRs
| engineering delivery installation setting in operation documentation
| 1998
|
Airport Poznan Lawica
Poland
| PAPI-system
| light fixtures cabling CCRs
| engineering delivery installation setting in operation documentation
| 1998
|
Airport Cochstedt
Germany
| Airfield lighting system Cable System
| cabling
| delivery installation
| 1998
|
International Airport Manas
Kyrgyzstan
| CompleteTurn-key Airfield Lighting System for International Airport
| light fixtures signs cabling CCRs control & monitoring system power supply
| engineering delivery installation setting in operation documentation
| 1998
|
Airport Hannover-Langenhagen
Germany
| Guidance Signs
| signs cabling
| engineering delivery installation setting in operation documentation service
| 1999
|
Airport Rhein-Neckar
Germany
| PAPI System
| light fixtures cabling CCRs
| engineering delivery installation setting in operation documentation
| 2001
|
Airport Augsburg
Germany
| CCR System, Control System Lights, Cable, Approach Masts
| light fixtures signs cabling CCRs control & monitoring system power supply
| engineering delivery installation setting in operation documentation
| 2001
|
Airport Warsaw
Poland
| Extension of CCR System
| cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2001
|
New Athens International Airport Sparta
Greece
| Extension Taxiway (Lights, Cable, ABB COSAL, ABB C&M System)
| light fixtures cabling CCRs control & monitoring system individual lamp control
| engineering delivery installation setting in operation documentation
| 2001
|
Airport Kastoria
Greece
| Extension of Runway (Lights, Cable)
| light fixtures cabling
| engineering delivery installation setting in operation documentation
| 2002
|
Heliport BASF
Germany
| Turn-key AFL System for Heliport
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2002
|
Airport Nogliki
Russia
| Turn-key AFL System
| light fixtures signs cabling CCRs control & monitoring system power supply
| engineering delivery setting in operation documentation service
| 2002/2004
|
New Athens International Airport Spata
Greece
| 3-years maintenance contract for AFL Control and Monitoring System
| CCRs control & monitoring system
| service
| 2002/2004
|
Airport Black Forest
Germany
| Complete new Approach Lighting System Approach Masts
| light fixtures signs cabling CCRs control & monitoring system
| installation setting in operation documentation service
| 2003
|
Munich Airport
| Taxiway Extension (Lights, Cable, Transformers, Adaptation of ccrs)
| light fixtures signs cabling CCRs
| engineering delivery installation setting in operation documentation service
| 2003
|
Airport Siegerland
Germany
| Step-by-Step Modernization of AFL System incl. COSAL, Lights, Cable
| light fixtures cabling CCRs
| engineering delivery installation setting in operation documentation service
| 2002/2004
|
Airport Augsburg
Germany
| Extension of OVR Lighting including Lights, Cable, Monitoring Change
| light fixtures signs cabling CCRs control & monitoring system
| delivery setting in operation
| 2003
|
Heliport Düsseldorf
Germany
| Turnkey Heliport Lighting System
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2003
|
International Airport Astana
Kazakhstan
| Reconstruction of the Complete AFL System
| light fixtures signs cabling CCRs control & monitoring system individual lamp control power supply
| engineering delivery installation setting in operation documentation service
| 2003/2004
|
Airport Dahlemer Binz
Germany
| Turn-key Airfield Lighting System for Regional Airport
| light fixtures signs cabling CCRs control & monitoring system individual lamp control power supply
| engineering delivery installation setting in operation documentation service
| 2004
|
Baden Airpark
Germany
| New Approach Sequence Flash Light System
| light fixtures cabling
| engineering delivery installation setting in operation documentation
| 2004
|
Airport Warsaw
Poland
| Upgrade and Reconstruction of Entire AFL Control & Monitoring System
| control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2004
|
Airport Bamberg
Germany
| Extension of AFL System
| light fixtures cabling CCRs
| engineering delivery installation setting in operation documentation service
| 2004
|
Airport Schwaebisch Hall
Germany
| Extension of Existing AFL System and Turn-key Upgrade to CAT I Conditions
| light fixtures signs cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2004
|
Airport Siegerland
Germany
| Extension of CCR System
| cabling CCRs
| engineering delivery installation setting in operation documentation
| 2004
|
Airport Nogliki
Russia
| Extension of Control & Monitoring System
| control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2004
|
Airport Speyer
Germany
| Adaptation of Runway Edge Lighting System
| light fixtures cabling
| delivery installation setting in operation documentation
| 2004
|
Airport Makedonia Thessaloniki
Greece
| Retrofit of Taxiway Lighting
| cabling
| delivery
| 2004
|
Airport Braunschweig
Germany
| Retrofit of Several Taxiways
| light fixtures cabling
| delivery installation setting in operation documentation
| 2004
|
Airport Mardin
Turkey
| Delivery and Commissioning of complete AFL System
| light fixtures signs cabling CCRs control & monitoring system
| delivery setting in operation documentation
| 2004/2005
|
Airport Bitburg
Germany
| Retrofit of Existing AFL System
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2004/2005
|
Airport Warsaw
Poland
| Integration of Third Party System Data in Existing AFL Control & Monitoring System
| control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2004/2005
|
Airport Luebeck
Germany
| Complete AFL System CAT II including CCR System + Control & Monitoring System
| light fixtures signs cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2004/2005
|
Heliport Pyrgos
Greece
| Delivery and Commissioning of AFL System for Heliport
| light fixtures cabling CCRs
| delivery setting in operation
| 2005
|
Heliport St. Vinzenz Cologne
Germany
| Turn-key AFL System for
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2005
|
Airport Warsaw
Poland
| Extension of Taxiway with Individual light control and Movement Guidance System with SCROLL
| CCRs control & monitoring system individual lamp control
| engineering delivery installation setting in operation documentation service
| 2005
|
Airport Munich
Germany
| Taxiway Extension (Lights, Cable, Transformers)
| light fixtures cabling
| engineering delivery installation setting in operation documentation service
| 2005
|
Airport Warsaw
Poland
| Upgrade of AFL Control & Monitoring Network
| control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2005
|
Airport Herzogenaurach
Germany
| Complete Renovation of Existing AFL System including Lights, Cabling, CCRs
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2005
|
Airport Oberpfaffenhofen
Germany
| Delivery and Commissioning of Complete AFL System
| light fixtures cabling CCRs
| delivery setting in operation
| 2005
|
Airport Warsaw
Poland
| New Taxiways for Terminal 2 incl. Extension of CCR System, Control & Monitoring System and Surface Movement Guidance with SCROLL
| CCRs control & monitoring system individual lamp control
| engineering delivery installation setting in operation documentation service
| 2005/2011
|
Airport Navoi
Uzbekistan
| Delivery and Commissioning of Complete AFL System
| light fixtures cabling CCRs control & monitoring system
| delivery setting in operation
| 2005/2006
|
International Airport Astana
Kazakhstan
| Extension of AFL Sys. with Individual Light Control and Surface Movement Guidance System with SCROLL
| cabling CCRs control & monitoring system individual lamp control
| engineering delivery installation setting in operation documentation service
| 2005/2006
|
Airport Termez
Uzbekistan
| Turn-key AFL System for International Airport
| light fixtures signs cabling CCRs control & monitoring system power supply
| engineering delivery installation setting in operation documentation service
| 2005/2006
|
International Airport Katowice-Pyrzowice
Poland
| Extension and Modernization of Control & Monitoring System
| control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2006
|
Airport Skyros
Greece
| Delivery of Light Fixtures
| light fixtures
| delivery
| 2006
|
Airport Olsztyn-Dajtki
Poland
| Delivery and Commissioning of AFL System including CCR System and Control & Monitoring System
| CCRs control & monitoring system
| engineering delivery setting in operation documentation service
| 2006
|
New Athens International Airport Spata
Greece
| Extension and Modernization of Control & Monitoring System
| control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2006
|
Airport Donauwörth
Germany
| Delivery and Commissioning of AFL System including CCR System Control & Monitoring System, Cabling and individual light control System
| cabling CCRs control & monitoring system individual lamp control
| engineering delivery installation setting in operation documentation service
| 2006/2007
|
Airport Kiel-Holtenau
Germany
| Turnkey AFL System for Heliport
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2006/2007
|
Airport Sibiu
Romania
| Delivery and Commissioning of AFL System including CCR System Control & Monitoring System, Cabling and Emergency
| signs cabling CCRs control & monitoring system individual lamp control power supply
| engineering delivery installation setting in operation documentation service
| 2006/2007
|
International Airport Chimkent
Kazakhstan
| Delivery and Commissioning of Complete AFL System
| cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2007
|
Airport Pafos
Cyprus
| Delivery of Taxiway Guidance Signsd
| signs
| delivery
| 2007
|
Airport Katsina
Nigeria
| Planning, Delivery and Commissioning of complete CAT I AFL System
| light fixtures signs cabling CCRs
| engineering delivery installation setting in operation documentation
| 2007
|
Airport Siegerland
Germany
| Replacement of Approach Flash Light System
| light fixtures cabling
| engineering delivery installation setting in operation documentation service
| 2007
|
City Airport Mannheim
Germany
| Extension of AFL System
| light fixtures cabling CCRs
| engineering delivery installation setting in operation documentation service
| 2007
|
Airport Nukus
Uzbesikstan
| Turn-key AFL-System for International Airport CAT I
| light fixtures signs cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation service
| 2007
|
Baden Airpark
Germany
| Turn-key reconstruction of AFL-System and upgrade to CAT IIIb
| light fixtures signs cabling CCRs control & monitoring system individual lamp control power supply
| engineering delivery installation setting in operation documentation
| 2007/2009
|
Airport Walldürn
Germany
| Turn-key AFL System inclusive Monitoring
| light fixtures signs cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2007/2008
|
Airport Warsaw
Poland
| Extension of AFL Control-and Monitoring System, data Integration into the Overall System
| control & monitoring system
| engineering delivery installation setting in operation documentation
| 2007/2008
|
Airport Pristina
Kosovo
| Delivery and Commmissioning of complete AFL-System, Control- and Monitoringsystem
| light fixtures signs cabling CCRs control & monitoring system individual lamp control
| delivery setting in operation documentation
| 2008/2009
|
Airport Pristina
Kosovo
| Delivery of AGL spare parts
| cabling
| delivery
| 2008
|
Airport Augsburg
Germany
| Rededication of OVR
| light fixtures signs cabling CCRs control & monitoring system individual lamp control
| delivery installation setting in operation documentation
| 2007/2008
|
Airport Mainbullau
Germany
| Extension of AFL-System
| light fixtures cabling CCRs control & monitoring system
| delivery installation setting in operation documentation
| 2007
|
Airport Mengen-Hohentengen
Germany
| Modernization of AFL-System, PAPI, Constant Current Regulators, Installation Primary Cable, Runway Edge Identification Lights, Installation of Meterological Equipment
| light fixtures signs cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2007-2009
|
Airport Augsburg
Germany
| Renewal of Constant Current Regulators Extension of AFL-System on Taxiways
| light fixtures signs cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2008
|
Airport Friedrichshafen
Germany
| Renewal of Control- and Monitoring
| control & monitoring system
| engineering delivery installation setting in operation documentation
| 2008/2009
|
Allgäu Airport
Germany
| Supplement and Extension of existing AFL-System
| light fixtures cabling
| delivery installation setting in operation documentation
| 2008/2009
|
Airport Targu Mures
Romania
| Upgrade of AFL-System to CAT II
| cabling CCRs individual lamp control
| delivery setting in operation
| 2008
|
Airport Mengen-Hohentengen
Germany
| Extension of PAPI
| light fixtures cabling CCRs
| delivery setting in operation
| 2008
|
Airport Kzyl-Orda
Kazakhstan
| Delivery of AFL System
| CCRs control & monitoring system
| engineering delivery setting in operation documentation
| 2008/2009
|
Airport Sir Bani Yas Island
Abu Dhabi
| Delivery of Wind Direction Indicator, PAPI-System and CCR-System for PAPI-System
| light fixtures cabling CCRs
| delivery setting in operation documentation
| 2008/2009
|
Airport Hof
Germany
| Electrical Installation Workings for Runway Edge Lights and Runway Edge
| light fixtures cabling
| delivery installation setting in operation documentation
| 2008/2009
|
Airport Altenburg-Nobitz
Germany
| Adaption of AFL-System due to asphalt coating of security areas
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2008/2009
|
Airport Mengen-Hohentengen
Germany
| Partial Renewal of AFL-System
| light fixtures cabling CCRs control & monitoring system
| delivery installation setting in operation documentation
| 2009
|
Airport Munich
Germany
| Reconstruction of Airfield Ligthing System on TDZ 26L
| cabling
| delivery installation setting in operation
| 2009
|
Airport Frankfurt
Germany
| Complete renewal of the Taxiway guidance signs with LED-technology
| signs LED cabling
| engineering delivery installation setting in operation documentation
| 2009/2010
|
Airport Frankfurt
Germany
| Installation and delivery of Runway Guard Light (synchronised)
| light fixtures LED cabling CCRs
| engineering delivery installation setting in operation documentation
| 2009-2011
|
Airport Zweibrücken
Germany
| Delivery and commissioning of a turn-key airfield lighting system
| light fixtures signs cabling CCRs control & monitoring system individual lamp control
| engineering delivery installation setting in operation documentation
| 2009-2011
|
Airport Frankfurt
Germany
| Delivery installation and commissioning LED taxiway lights with individual lamp control
| light fixtures LED cabling individual lamp control
| delivery installation setting in operation documentation
| 2009-2011
|
Airport Warsaw
Poland
| Extension of the technical monitoring system
| control & monitoring system
| engineering delivery installation setting in operation documentation
| 2009
|
Airport Frankfurt
Germany
| Delivery installation and commissioning of CCR systems for 2 stations
| cabling CCRs
| engineering delivery installation setting in operation documentation
| 2009-2011
|
Airport Abuja
Nigeria
| Delivery and commissioning of a airfield lighting system
| light fixtures signs cabling CCRs control & monitoring system containerstation
| engineering delivery installation setting in operation documentation
| 2009/2010
|
Airport Rhein-Neckar
Germany
| Delivery installation and commissioning of LED runway guard lights
| light fixtures LED cabling
| delivery installation setting in operation
| 2009
|
Airport Mengen-Hohentengen
Germany
| Extension of PAPI
| light fixtures cabling
| delivery setting in operation documentation
| 2009
|
Heliport St. Vincensius Hospital Karlsruhe
Germany
| Renewal of the Heliport System
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2010
|
Airport Bremen Germany
| Renewal of the Control and Monitoring System
| control & monitoring system
| engineering delivery installation setting in operation documentation
| 2010/2011
|
Airport Borispol Kiev
Ukraine
| Delivery and commissioning of complete AFL System Control- and Monitoring System for Taxiway F
| light fixtures signs cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2010/2011
|
Airport Borispol Kiev
Ukraine
| Delivery and commissioning of 400 Hz System
| power supply
| delivery installation setting in operation documentation
| 2010/2011
|
Airport Giebelstadt
Germany
| Delivery and commissioning of complete AFL System Control- and Monitoring System
| light fixtures signs cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2010
|
Airport Frankfurt
Germany
| Renovation of Runway Head
| light fixtures cabling
| delivery installation setting in operation documentation
| 2010/2011
|
Airport Frankfurt
Germany
| Integration of taxiway bridges
| light fixtures LED signs cabling CCRs indiviidual lamp control
| delivery installation setting in operation documentation
| 2010/2011
|
Airport Frankfurt
Germany
| CAT III Turn-key airfield lighting system for Runway North-West
| light fixtures LED signs LED cabling CCRs individual lamp control
| delivery installation setting in operation documentation
| 2010/2011
|
Airport Frankfurt
Germany
| CAT III Turn-key airfield lighting system for taxiway system south
| light fixtures LED signs LED cabling CCRs individual lamp control
| delivery installation setting in operation documentation
| 2010/2011
|
Airport Otopenie Bukarest
Romania
| Complete renovation of the control system CCR system and individual lamp control system
| CCRs control & monitoring system individual lamp control
| engineering delivery installation setting in operation documentation service
| 2010/2011
|
Airport Warsaw
Poland
| Extension of the technical monotoring system
| control & monitoring system
| engineering delivery installation setting in operation documentation
| 2010
|
Airport Rostock-Laage
Germany
| Extension of CCR system
| CCRs
| engineering delivery installation setting in operation documentation
| 2010/2011
|
Airport Schwäbisch Hall
Germany
| Extension of the approach lighting system
| light fixtures cabling
| delivery installation setting in operation documentation
| 2010
|
Heliport Siloah Hospital Pforzheim
Germany
| Reconstruction of Airfield Lighting System for heliport
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2010
|
Airport Stuttgart
Germany
| Delivery of Runway Guard Lights
| light fixtures LED
| delivery
| 2010/2011
|
Airport Siegerland
Germany
| Renewal of the control system
| control & monitoring system
| engineering delivery installation setting in operation documentation
| 2010/2011
|
Airport Pristina
Kosovo
| Delivery spare parts
| light fixtures cabling control & monitoring system
| delivery
| 2010/2011
|
Airport Friedrichshafen
Germany
| Delivery of taxiway guidance signs
| signs
| delivery
| 2010/2011
|
Airport Frankfurt
Germany
| Framework contract for airfield lighting
| light fixtures signs cabling
| engineering delivery installation setting in operation documentation
| 2010/2011
|
Airport Kokchetau
Kazakstan
| Delivery and commissioning of complete AFL System Control- and Monitoring System
| CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2010/2011
|
Airport Friedrichshafen
Germany
| Delivery of LED Treshold Identification Light
| light fixtures LED
| delivery
| 2010/2011
|
Airport Bonny Island
Nigeria
| Delivery and commissioning of complete AFL System
| light fixtures signs cabling CCRs control & monitoring system individual lamp control
| engineering delivery installation setting in operation documentation
| 2011
|
Airport Hannover
Germany
| Delivery of secundary transformers and connector kits
| cabling
| delivery
| 2011
|
Heliport Lagos
Nigeria
| Turn-key AFL-System for heliport
| light fixtures cabling CCRs control & monitoring system
| engineering delivery installation setting in operation documentation
| 2011
|
Airport Sylt
Deutschland
| Delivery of the PAPI system
| light fixtures
| delivery installation setting in operation
| 2011
|